Re: XML TO .CSV Conversion issue
Re: "Numbers stored as text" error in Excel when I schedule a report
what is the formula where you get the numbers converted as text ?
Re: Enterprise Compensation Management without Budgeting & LTI
Hi,
Budgeting & LTI are not required for you to implement SAP Enterprise Compensation Management. They are seperate sub-modules within ECM. From what it sounds like your requirements are just to implement annual bonus and merit each year. If this is the case you can implement only the "Compensation Administration" section within ECM. This would be located in the SAP IMG under Personnel Management --> Enterprise Compensation Management --> Compensation Administration.
Thanks,
Imran
Re: Configurer HR Renewal workforce viewer for a Personal Assistant
Hi Siddharth,
The "problem" is that I am not trying to change the default OADP for HR Admin but I amtrying to do this with a copy of the MSS renewal role.
As i write above I need to be able to open My team with my new PA role and have the ORG chart displayed with the people that are "below" the manager that the PA is working for(typical this is all employees in the managers Org struct minus the manager him self).
Re: Project settlement to COPA
Hi,
Can you see all your cost bifurcation in report S_ALR_87013543.? Just double click on the actual amount and again double click on project actual cost line items
Regards,
Amit
Re: damaged stock at vendor place in subcontracting process?
Requirement:
client want to charge from vendor for those material.
can it be returned to warehouse ? which scenario is it possible?
Re: EHP7 upgrade stuck in SCANDIR_EPS0
Tried that, but same error.
What are the major differences between hana 2013 and 2014 release
Hi Guys,
I am planning to learn sap hana and write certification exam. As sap release new platform 2014, may I know what are the major deference between 2013 and 2014 release or its just enhancement pack on top of 2013.
Please help me....thank you in advance.
Regards,
Tapas
Re: How can i delete rows in ui5 table?
Re: Mobile screen size and fit to the screen in the RF gun
Dear Oisin,
This issue was solved with metadata.
Regards,
Prathap
Re: Value flow to COPA.(KE21N)
Dear Waman ,
Thanks for your reply.
"Anyways I do not see how the internal architecture of COPA matters from a user viewpoint"
Nowhere I have mentioned that I`m thinking from a user viewpoint, i was interested to know how does internal architecture of COPA works for my knowledge as I want to be assured on what I`m working or delivering it as a solution to client.
One can never assume what`s going on in client`s mind after all client is client.
Any ways thanks for your input.
Regards
Nitisha
Re: how to send the report output as pdf attachment
Please go in SE38 and check the SAP example program = BCS_EXAMPLE_6
You will find the example code.
~Lokesh
Re: Can PR be transferred to SRM without PI in V7.x ?
Hi Jesse,
PR and PO both can be transferred to the SAP ECC backend through RFC and hence PI is not necessary. It is only if you need SRM to connect to non-SAP systems (& SAP systems like SUS), you require PI.
Please set-up an RFC connection in SM59, job(as mentioned by Robin) and the other settings like n umber ranges, transaction types and back-end document types you should be good to go.
Hope this helps
Cheers,
Yateesh
Re: How to setup Disaster Recovery system for SAP ERP 6.0
Have you read the SAP note I have provided ?
It has all the information you need. The DR site should be setup with the same SID.
RB
Re: Manager booking Training on behalf of Employee MSS-NWBC.
the activity which your doing in that t-codes as administrator, it can be by manager for his subordinates using these two applications.
read more details at Manage Participation - Manager Self-Service in SAP NetWeaver Business Client - SAP Library
Re: SetValue Explaination
Hi,
Is the issue is rectifed ???
if yes,can u please close the thread ....!
By marking the "Correct Answer"...
Regards,
Prasad
Re: use of FORK in workflow
in a step when you don't know which condition or which event will trigger then fork is used. suppose we have an activity where po is created and later we are doing some operation on it . we don't know what the agent will do ( he may change the po or hemay release the po ). then we use fork with 2 branches. both branches we will add wait step one for change event of bo for PO one for Release event. if any event is triggered among these two then the corresponding branch will be processed.
Re: Matrix Not Loading
Hi,
Is the issue is rectifed ???
if yes,can u please close the thread ....!
By marking the "Correct Answer"...
Regards,
Prasad
Stoping notification: A new Bid for a Bid Invitation has been Received, once a response is submitted
Dear SRM experts,
I need your help in stopping one notification completely.
Once a Rfx response is submitted by bidde against a Rfxr, automatically system is sending a below notification to purchaser:
A new Bid for a Bid Invitation has been Received
But as per the bid secracy we dont want this notig=fication to be triggere by the system. We need to stop is completly.
Notification also contain a link to response. We have also made some validations on response and awards button of Rfx. But because of this link, those validation are bypassed.
Can anyone please let me know how to stop these notification for trigerring?
I will be greate help.
Thanking you in advance.
Thanks,
Manil
Re: Transport Error For Bex Query to BW Production
Hi Aparajit,
The same TR can be imported again if the import had failed.
You can check the logs for your TR in SE01 by drilling down the errorneous step whether some dependent object is missing in target system. But RC 16 is purely a system issue. Take help of Security/Basis team for checking the roles whether system is up all the time while transport.
-Nikhil