Hi
I’m starting with DS 1.6 SP1 and I would like to use scorecard component to full fill one of my requirements.
My scenario, to be used with scorecard component, is one dimension against several measures to be displayed in multiple columns with multiple charts (including combination charts), but this dimension can be change dynamically with other possible dimensions.
With DS 1.5 I was able to develop this same scenario with several charts displayed against one dimension selected by the user, like:
Possible drill down:
Now in DS 1.6 SP1 I want to rebuild this scenario by using the scorecard component but, after some analysis, I’m not able to change one dimension dynamically by swapping a dimension with different one at the data source level, like:
DS_1.swapDimensions("0COMP_CODE__YGZONE", "0COMP_CODE__YGSUBZONE");
If I do this logic in DS 1.6 I get :
After reading:
Design Studio 1.6 - Advanced Selection in Scorecard
http://scn.sap.com/community/businessobjects-design-studio/blog/2015/12/18/design-studio-16--advanced-selection-in-scorecard
I’ve tried to change the “Advanced Row Scope Selection”:
By using a global variable instead of the dimension, like:
On startup of the app:
swap_dimension = “0COMP_CODE__YGSUBZONE”;
In “Advanced Row Scope Selection” I changed to:
{/swap_dimension : “*”}
Or
{swap_dimension : “*”}
Without sucess !!!
So, can you please suggest how can I dynamically change a dimension used in scorecard component?
Waiting by your soonest reply
Regards
Armando Santos