We are using the Automated Monitoring in GRC Process Control 10.0 to configure a job for SAP standard control and have a problem with the job scheduler. We perform the search for control selection in the step 3(Select Control) and this display the warning message “There is no data matching the selection criteria, please refer to help”.
The scenario created is follows:
Business rule (Configurable Type) was created with valid date of 01.01.2013 to 31.12.999
In the Activities and Processes section, process and subprocess was created. Later the corresponding control was created. This control has a regulation, risk and control objective assigned.
Thanks.