Quantcast
Channel: SCN: Message List
Viewing all 8746 articles
Browse latest View live

Re: Issue in Accessing Smart Business Tile using APF Framework

$
0
0

Hi Jutta,

 

Thank you for your responses. I am still unable to proceed. I have deleted the target mapping also.

 

Here are the steps I have followed. I have created a configuration using the APF Configuration Modeler

 

apf1.PNG

apf2.PNG

apf5.PNG

 

I have made the tile config as :

 

apf3.PNG

I am getting the same pop up error as mentioned before and then it navigates to the below screen.

apf4.PNG

 

Am I missing some step here? Please let me know.

 

Regards,

Karan


Re: Which are the layouts we can use under sap.ui and sap.m ?

Re: Comma separated currency value in UI5 vizframe

$
0
0

Thanks for your response Chapman. The challenge we are facing here is not formatting but showing the formatted output in graph.

We are able to format the big decimal value coming from oData service to format like 1,23,456.000 which is a string formatted value. But, while we are trying to put this comma separated value to graph, it's not getting plotted.

 

Can you please suggest.

Re: Unable to finf RFC destination for QM connection

$
0
0

Hi Sandip,

 

I believe you must work with QIE if you want to work with quality management in EWM. The QIE engine will communicate with QM in ERP.

Re: Loading PM Orders via LSMW

$
0
0

Hi Raj

 

I have done the same BDC for IW61. But unable to add components with that.

Can you help me on  that?

 

 

 

Thanks

Ramesh

Re: Cleared invoices Check Box not there in Process Receivables (Collection Mgmt.)

$
0
0

Hi Mark

 

Thanks for your reply.  the question i have asked is different. Here let me explain it again i have two systems and  i have configured the collection management in both in the first system we have a check box of cleared invoices but in the second system we dont  have could you please let me know the reason why we are not getting the cleared invoices check box? have i missed any of the configuration for this. please help me  in this regard

 

Note; I have done the same configurations in the both the systems.

 

Thanks!

Kasi Reddy

Re: How often should a BI 4.x environment be restarted

Re: Access Control

$
0
0

Hello Thanarat,

 

This message means that the UI is not assigned to your user.

Please check if the resp. work center is assigned

 

Bye,

   Horst


Re: Need to move Org structure from one system to another system

$
0
0

Hello B T,

 

Please check the reports RHMOVE00 and RHMOVE30 and their related documentation.  Please make sure that your basis consultant knows exactly what he (or she, as the case may be) is doing or you might end up with incomplete transport or duplicated org structures.

 

 

Best Regards,

Aman

Re: Professional Tax not Deducting for the April Month for 2 employees May onwords deducting properly?

$
0
0

pt 3.png

 

 

 

pt4.pngpt5.png

 

 

dear Experts

 

 

I have given Prejection details in April screen and May screen pl find the difference

 

more over it is only for two employee kindly consider this one as important i checked the master data as well no changes found.

 

As above exprets  suggestion i am sending the slab table as well.

 

pl go through and provide the solution

Re: Update BKPF-XBLNR & INFVO-XBLNR during MRRL

$
0
0

Hi Devendra,

 

You can try substitution techniques using call up points. The above is a substitution BADI as well.

SAP HANA Intercompany - Required DBs for backup and restore procedures

$
0
0

Hi all,

 

Good day!

 

I would like to know if what would be the databases needed to be backup for Intercompany purposes coz I don't see the list in the Intercompany Admin guide 2.0

 

As far as I know, we need the ff to be backup:

1. Consolidation, Home office and branches databases

2. IFSERV

3. LANDSCAPE

4. SBOCOMMON (not sure)

 

Do we missed out on other databases to be backup? Also can you point out what are critical steps to properly restore the databases and setup for ICO to prevent errors in the future?

 

Hope to hear from you soon. Thanks!

Re: ANSI 856 ASN Hierarchy level Mapping - problem with HL segments

$
0
0

Hi Kavitha,

 

attached you can find the payload. It's a shipment05 IDoc.

 

Regards,

Christian

Re: Short dump when calling FM BAPI_TRANSACTION_COMMIT

$
0
0

There is no update FM triggered.

Sorry but you're wrong; the COMMIT_IN_POSTING exception that you have mentioned (in your screen capture) proves that there is an update task (so there is an update FM).

 

Maybe you didn't understand that your code is executed by a standard update function module?

Re: Binding json to Table created on xml view


Re: The baseline date is not changing when we change the posting date in MIRO

$
0
0

Dear Sir ;

 

I think system is behaving in correct manner only .thing is that when first time you open MIRO  transaction then by default it will take system  date as posting date and as per "SPRO" setting it will decide the  base line date now as you done some thing again you come back to Basic data tab there is a inception and due to that system still retain the baseline date ,press enter and check wheather it is changing or not .

 

It must change .

 

Best Regards;

Joydeep Mukherejee

Re: Cache Clear Z Scenario

$
0
0

Your question is not clear but if you want to clear the cache do as below -

 

Backend System - Open transaction  /N/IWBEP/CACHE_CLEANUP and clear cache

 

Gateway System - Open transaction  /N/IWFND/CACHE_CLEANUP and clear cache

 

BR.

Re: SAP BI - Compression step failing with Overflow during operation '+'.,Message no. DBMAN102

$
0
0

Hi Rene,

 

Please find the update as below.

 

My data base is 'DB2' and yes, I tried to do the manual compression as well but getting same error as I mentioned.

 

actually this also coming from last 3 days and before to that there is this kind of issue on same data target.

.

I will check that note once meanwhile if you could find any solution, please update me.

 

Thanks!

 

 

@Venkat.

Re: Partially settelement an asset in service

$
0
0

Hi Thirupathi,

 

Yes you can run actual settlement of project/wbs/network t code -CJ88.

 

Created an asset for the WBS element in th project builder where the rule will be generated automatically.

 

Path: Goto Menu> Edit > WBS element> Investment programs>Create complete asset.

 

Else create an Asset using AS01 and maintain the rule manually for the WBS element.

 

Now go to CJ88 T-code:  enter your project number or wbs element with settlement period, year and PROCESSING TYPE "FULL SETTLEMENT".

 

Execute the transaction, the costs are settled from AUC to Asset.

 

Normal there is no need to change the status of WBS to TECO for final settlement.

Re: Cost Center appearing in non cost-element GL while simulating MIRO?

$
0
0

In OKC9 one substitution exist but its prerequisite includes GL=403042. Hence i suppose substitution will not trigger. Is document splitting anything to do in this.???

 

Regards,

Alok

Viewing all 8746 articles
Browse latest View live




Latest Images